Public buildings

Estonian Knighthood building

  • Low voltage, extra low voltage and automation installations
  • Gross area: 3,500 m2
  • The Estonian Knighthood building will be shaped into the country’s representative building, where it is possible to organize meetings, conferences, receptions and other events. The building will be complemented by the various smart electronic solutions, thereby modernizing the more than 150 year-old building to suit with the society’s contemporary needs.

Vabamu

  • Low voltage, extra low voltage and automation installations
  • Gross area: 2,700 m2
  • The Museum of Occupations will be completely modernized, symbolized by its new name – Vabamu. The exposition will be renewed through modern technical solutions and the museum is expanded. This is the first building in Estonia that was built specifically to be a museum.

Modernization of the learning environment
and exhibition at the Natural History Museum of Tartu University

  • Low voltage, extra low voltage and automation installations
  • Gross area: 1,480 m2
  • Natural History Museum at the premises of Tartu University was renovated and modernised. Its lighting solution and illumination of exhibition displays was based on the “smart house” approach.

Seaplane Harbor

  • Project of utility networks, low voltage and extra low voltage installations
  • Gross area: 7,000 m2
  • The compex was initially a part of the Naval Fortress of Peter the Great and it was designed by Danish architects. In 2011, it was reconstructed as a Maritime Museum. The museum includes several “self-designed” equipment, which are all controlled by KNX. It integrates a dynamically controlled lighting and sound solution and includes various mobile equipment and gates.

Resort Hotel & SPA Estonia

  • Project of utility networks, low voltage, extra low voltage and automation installations
  • Gross area: 10,500 m2
  • Project of Estonian SPA encompassed the renovation of two buildings – the White Building and the Green Building. In case of the White Building, the solution covered practically the whole building and a conference, spa and recreation complex of app. 4,733 m2 was established. In case of the Green Building, the hotel suits and restaurant received a new and modern look together with a new electrical and lighting solution.