Industrial facilities

Ash disposal system of the new 300MW oil shale Eesti Power Plant

  • Medium voltage, low voltage and extra low voltage systems installation, automation
  • Installed power: 2MW
  • During the engineering process four 10kV dredging pump power supply and control system was designed. Pneumatic tube transport system of dry ash and the disposal system of wet ash. Complete automation system for control and monitoring, which will be connected to a new 300MW power plant SCADA system.

Sillamäe Oil Refinery Plant

  • Low voltage and extra low voltage systems installation, process automation
  • Territory area: 22,5ha
  • Installed capacity: 20MW
  • Produced power: 37MW

Key items:

  • 2x power units, for refinery system power supply
  • 4 x 6 / 0.69 / 0.4 substation
  • Raw fuel tank pit, dark fuel tank pit, light fuel tank pit
  • Auto-loading gantry
  • Process control center

AS Nordkalk Rakke Limestone Factory

  • nordkalkLow voltage and extra low voltage systems installation, process automation
  • Installed power: 1MW
  • Raw material storage
  • Transportation gallery
  • Limestone bunkers
  • Limestone incrinerators (100t)
  • Crushing center
  • Screening center
  • Storages for end product